URBAN GREEN COMMAND OFFICE OFFICIALLY TOPS OUT THE PROJECT   

Ho Chi Minh City, on the morning of January 24, 2024, Coteccons officially topped out Urban Green, a project developed by Kusto Home – a prestigious real estate brand under the multinational Kusto Group. The topping-out ceremony was attended by representatives from the client, the company’s leadership, the supervision consultant, the project management team, as well as subcontractor partners and suppliers involved in the project. 

Urban Green marks the second collaboration between Coteccons and Kusto Home following the success of the Diamond Island project. Built on a scale of 20,203m², including one basement with an area of 12,322m² and two 24-story blocks, with a construction density of 32.3%, Urban Green, when completed, will offer a modern and comfortable living space for residents. The total project floor area is 100,746m², designed with high standards and over 60 amenities including sports, leisure, and green spaces, promising to create a high-class and convenient urban area that meets the living needs of residents in a hotspot for technology and economic development in Ho Chi Minh City. 

As the general contractor for the structural, finishing, and infrastructure works of the Urban Green project, Coteccons faced unique challenges with the 16-20m of weak mud geology, and the necessity to address infill construction, which posed significant safety risks during foundation and basement floor construction. To tackle these challenges, Coteccons engineers implemented a unique construction method using CDM piles ranging from 5-8m in length to replace the weak soil beneath the foundation and basement floor, enhancing the load-bearing capacity of both the foundation and basement floor while ensuring safety during the excavation of the basement pit under difficult geological conditions. 

Additionally, during the infrastructure construction, the Site Management Board had to contend with frequent waterlogging on the small road in front of the project, caused by the insufficient capacity of the existing drainage system. To resolve this issue, the Site Management Board had to construct a new drainage line, a new road, and improve the overall situation. 

Through experience and professionalism in project management, Coteccons not only achieved safety, quality, and progress but also provided the highest satisfaction for the client The total structural construction progress exceeded the initial commitment by 39 days, a proud achievement for the energetic, passionate, and dedicated team of engineers, demonstrating their determination to achieve the highest goals. 

The Urban Green project is not only the result of a successful collaboration between Coteccons and Kusto Home but also a reflection of Coteccons’ professionalism and dedication to every project we undertake. 

Upon handover to residents, Urban Green is expected to become a highlight on the city’s real estate map, meeting the demand for high-quality, green, and modern living standards. 

RELATED POSTS

Hanoi, December 26, 2025 – Coteccons Construction Joint Stock Company is honored to be recognized at the VALUE500 – VBE500 – VBW10 – MAE50 Announcement and Award Ceremony, a prestigious annual event jointly organized by Viet Research and Vietnam Investment Review (VIR). At the ceremony, Coteccons was proudly awarded across four key rankings: Top 10 Vietnam Value Creators – Construction Sector (VALUE10): Coteccons ranked No.1 in the industry, while also making a strong leap on the national VALUE500 ranking, rising 47 positions from 120/500 in 2024 to 73/500 nationwide.  Vietnam Top 500 Best Employers (VBE500): Coteccons advanced 19 places, from 54/500 in 2024 to 35/500 nationwide.  Vietnam Top 10 Best Workplaces – Construction Sector (VBW10): Coteccons maintained its No.1 position in the industry ranking.  Top 50 Most Attractive Employers 2025 (MAE50)  Mr. Pham Quang Vu – Board Member, representing Coteccons, receiving the VALUE10 award  Mr. Truong Thanh Hai – Workforce Planning & Deployment Manager, representing Coteccons, received the VBW10 and MAE50 awards Within the framework of Viet Research’s annual research and ranking programs, Coteccons’ presence across all four prestigious lists reflects a comprehensive recognition of its value creation capability, employer attractiveness, and workplace quality. Specifically, VALUE10 honors enterprises that serve as value pillars of the national economy based on business performance, innovation, and sustainable development; VBE500 recognizes leading employers through assessments of workforce scale, working environment, and employee satisfaction; VBW10 highlights industry leaders in  workplace quality;  while MAE50 identifies the most attractive employers based on brand appeal, innovation capability,  and long-term investment in people. Achieving high rankings simultaneously across all four lists demonstrates that Coteccons not only creates sustainable value in its business operations but also builds a credible, attractive, and widely recognized working environment for employees, candidates, and stakeholders. These achievements are especially meaningful in a global

Coteccons pursues sustainable development with governance as its spearhead, ensuring alignment from leadership mindset to on-site operations. This approach enabled the company to cut more than 237,000 tons of CO₂e during fiscal year 2025 (July 2024 – June 2025). Over the past year, the company used 48% green steel—equivalent to more than 300,169 tons—sourced from suppliers certified under LEED, EPD, and LCA standards. At the same time, Coteccons incorporated over 41.2 million XMCL bricks (non-fired bricks), accounting for 50% of the total bricks used during the year. Beyond materials, Coteccons invests in people and operational excellence. More than 200 employees were trained in greenhouse gas inventory to strengthen ESG implementation at construction sites. The company rolled out safety and welfare programs for workers, recording over 46.5 million safe working hours across 56 projects and providing more than 14,000 free health check-ups for laborers. Between 2022 and 2025, Coteccons also planted over 33,000 native trees to help restore upstream forests.

Ho Chi Minh City, December 19, 2025 – After more than a year of construction, the “Thuy Van Coastal Road Beautification Project, Vung Tau City” – “the face” of Bai Sau Beach – with a total public investment of over VND 1,068 billion, has been officially inaugurated. This large-scale coastal infrastructure project carries strong symbolic significance in developing public spaces, enhancing quality of life, and promoting sustainable tourism. Amid the national drive to develop modern infrastructure, Coteccons (HOSE: CTD) has left a notable mark by undertaking Package No. 12, valued at VND 485 billion, comprising two key components: the renovation and upgrading of technical infrastructure along 3.2 kilometers of Thuy Van Road, and the construction of Thuy Van Park covering an area of approximately 19.21 hectares. The project’s completion ahead of major holidays such as Christmas, New Year, and Lunar New Year plays an important role in attracting tourists and stimulating the marine-based economy of Ho Chi Minh City. Leaders of Ho Chi Minh City and delegates cut the ribbon at the project inauguration ceremony The Ministry of Construction has announced the commencement and inauguration of 234 key projects nationwide, with a combined investment value exceeding VND 3.4 quadrillion, spanning infrastructure, transportation, urban renewal, and public space development. These projects highlight the strong acceleration of public investment across the country, serving as a critical driver of socio-economic growth. In this context, Coteccons views its participation in infrastructure and public investment projects not only as a business opportunity but also

84.28-35142277
Contact@Coteccons .vn

GENERAL INQUIRIES​