OFFICIAL TOPPING-OUT CEREMONY OF HAI PHONG’S HIGHEST TOWER

On September 15, 2023, the topping-out ceremony of the Landmark Hotel Tower, which is in the Diamond Crown Hai Phong Complex, is officially organized. This is the representative construction for the Hai Phong “brand” due to its uniqueness, which is full of architectural and iconic value.

Unique design contributed to the unprecedented sophistication of Asia

Located in the most business-oriented intersection of the port city, the Le Hong Phong and Nguyen Binh Khiem intersection (Ngo Quyen District), Diamond Crown Hai Phong has a total area of 12.868 m2. This is a complex project that consists of a 39-story luxury apartment tower and a 45-story 5-star hotel tower. The developer of the project is DOJILAND Company Limited, a member of the DOJI Group. Not only possessing a golden position, Diamond Crown Hai Phong also impresses with its height of 186m, the highest in the city, as if affirming the position of a modern Hai Phong reaching international level. In particular, the most unique feature of the project is the unique grid design, which has never appeared in any project in Vietnam or Asia. However, this is a big challenge for investors and contractors.

With unique architecture and record height, the Diamond Crown Hai Phong project changes the appearance of the city center of Hai Phong Port

“This is one of the most difficult projects I have ever worked on. This is the first project in Vietnam and Asia to use an external column frame structure system called Diagrid columns as a load-bearing element. Other projects in Dubai or the US only use diagrid structures for decorative purposes, which is not a load-bearing element; take the iconic projects Capital Gate (Dubai), Hearst Tower (USA), Mopheus Hotel (Macau), and Newfoundland Residence (UK), for instance. People can use steel, with shaped steel placed inside. The process is also carried out in a rolling form, which means we will then paint directly on the column system without making any additional changes. That is very challenging,” said Mr. Nguyen Tuan Sy, Project Manager of Coteccons & Unicons, the contractor.

Also, the structures of these diagrid column systems are not similar to one another, so it is impossible to order mass production molds. The column systems are processed separately. Inside the column system, there are not only concrete structures and regular steel columns but also I-shaped, H-shaped, and X-shaped steel systems, making them extremely complex. Materials and types of steel to build these diagrid column systems must also be ordered from abroad and are not available in Vietnam, so time must be carefully calculated and balanced. Coteccons assigns each employee to only be responsible for monitoring 1-2 columns to ensure accuracy down to the last inch, not allowing any errors to occur.

Besides the technical difficulty, the team also faced the problem of progress. The Diamond Crown Hai Phong project has two buildings: a 39-story apartment tower that needs construction in 320 days and a 45-story hotel tower that needs construction in 450 days, which is extremely urgent. This is unbelievable progress in the context of the construction industry, which is facing many difficulties. However, with the investor’s enthusiasm and the companionship of experienced contractors, each bottleneck in the construction process of Diamond Crown Hai Phong has gradually been removed.

Decoding BIM technology applied to mega projects

The project applies the BIM (Building Information Model) model, an advanced process applied in the construction industry to manage risks and conflicts. Through the application of BIM, Coteccons and Unicons engineers can analyze price, energy, construction time, and construction and maintenance methods.

“We always update and supplement continuously throughout the working process, from drafting to completion. With the old method, transferring information from the design team to the construction team is a big deal. Every small edit will affect many other drawings, and they all have to be done manually. All data is not linked uniformly and automatically, so updating and supplementing is extremely difficult, especially finding conflicts in the project. The risk of errors and delays in project progress is extremely enormous,” said a Coteccons representative.

Given the complexity and difficulty of construction, a series of the most modern technologies have been applied to the Diamond Crown Hai Phong project

Due to the intuitive model design, the entire project will be included in a digital model in the most detailed and accurate way. Investors can view each component of the project and every smallest detail, depending on the level of the model. The investor easily has the most intuitive view of the project; the structural design team, MEP, etc. can easily detect conflicts and optimally design details in the space of the building. In addition, by applying this model, the project can shorten the progress by 20–30%, contributing to optimizing the cash flow of the parties and thereby saving 10-15% of the total investment capital, according to the index project commander. For that reason, BIM is considered an effective information management process that ensures the design is consistent with the original concepts of the investor.

The Diamond Crown Hai Phong project is considered by experts to be as difficult and complex as Landmark 81 and is expected to be a symbol in the Northern region in general and Hai Phong in particular.

Prestige of DOJILAND Investor

The real estate market has gone through the first half of 2023 with a series of difficulties and challenges: transactions have declined, buying demand continues to fall, investment sentiment is weak, and general liquidity has not shown signs of decline. recovery signal. Overcoming difficult times in the market with the Hai Phong Diamond Crown Hai Phong Complex project, DOJILAND continues to show its bravery to conquer the real estate market with the mark of “unlimited creativity”.

At the end of 2021, when the Diamond Crown Hai Phong project started to be constructed, the story of the “diamond crown design” and the rare “Diagrid architecture” in the world was still an open question.

The international 5-star Diamond Crown Hai Phong Hotel Tower, with a record height of 186 m, will be a new architectural and lifestyle symbol of Hai Phong City.

On May 28, 2023, the project officially topped out, ready to be handed over in the fourth quarter of 2023, bringing true and clear answers to the specialized concepts of design and architecture.

On September 15, 2023, the Topping Out Ceremony of the landmark hotel tower located in the Diamond Crown Hai Phong project complex was officially held to signify the commitment to progress and guarantee the reputation of the investor.

By providing high-class accommodation services and unique and unforgettable experiences for residents and tourists, Diamond Crown Hai Phong will certainly contribute positively to the development of tourism and the development of the entire city.

In the coming time, DOJILAND will continue to develop luxury real estate projects under the Diamond Crown brand in many provinces and cities across the country, such as Hanoi. HCM, Vinh Phuc, Ha Long, Hue…

With a methodical investment strategy and continuously launching a series of high-end projects across the country, DOJILAND has been affirming its position, reputation, and capacity as a leading real estate investor with its quality and sustainable, timeless value projects.

 

 

 

RELATED POSTS

Ho Chi Minh City – Nhan Dan Newspaper, the Ho Chi Minh City Press Center, and Coteccons Construction Joint Stock Company have signed a Memorandum of Understanding, officially expanding the “Xây Tết 2026” program in Ho Chi Minh City. The program aims to care for 8,000 workers in the city, including construction workers, environmental sanitation workers, and urban drainage workers. Representatives of Nhan Dan Newspaper, the City Press Center, Coteccons, Ho Chi Minh City departments, enterprises, and charitable organizations jointly performed the ceremony marking their commitment to organizing “Xây Tết 2026” for 8,000 workers within and beyond the construction sector in Ho Chi Minh City “Xây Tết”: A Year-Round Journey of Companionship According to Mr. Nguyen Van Khanh, Deputy Director of the Ho Chi Minh City Press Center, Xây Tết is a large-scale social welfare initiative aligned with the city’s orientation toward comprehensive care for workers’ well-being during the Lunar New Year. Mr. Nguyen Van Khanh, Deputy Director of the City Press Center, delivers remarks at the ceremony “The program not only brings a more fulfilling Tet to workers, but also spreads humane values, a culture of occupational safety, and self-protection awareness within the community”, Mr. Khanh emphasized. The Ho Chi Minh City Press Center will act as the coordinating and communication hub, working closely with Nhan Dan Newspaper, Coteccons, and relevant stakeholders to ensure the program is implemented effectively, in line with its objectives, and generates positive social impact. Highly appreciating the “Xây Tết” program, Mr. Le Nam

Hanoi, December 26, 2025 – Coteccons Construction Joint Stock Company is honored to be recognized at the VALUE500 – VBE500 – VBW10 – MAE50 Announcement and Award Ceremony, a prestigious annual event jointly organized by Viet Research and Vietnam Investment Review (VIR). At the ceremony, Coteccons was proudly awarded across four key rankings: Top 10 Vietnam Value Creators – Construction Sector (VALUE10): Coteccons ranked No.1 in the industry, while also making a strong leap on the national VALUE500 ranking, rising 47 positions from 120/500 in 2024 to 73/500 nationwide.  Vietnam Top 500 Best Employers (VBE500): Coteccons advanced 19 places, from 54/500 in 2024 to 35/500 nationwide.  Vietnam Top 10 Best Workplaces – Construction Sector (VBW10): Coteccons maintained its No.1 position in the industry ranking.  Top 50 Most Attractive Employers 2025 (MAE50)  Mr. Pham Quang Vu – Board Member, representing Coteccons, receiving the VALUE10 award  Mr. Truong Thanh Hai – Workforce Planning & Deployment Manager, representing Coteccons, received the VBW10 and MAE50 awards Within the framework of Viet Research’s annual research and ranking programs, Coteccons’ presence across all four prestigious lists reflects a comprehensive recognition of its value creation capability, employer attractiveness, and workplace quality. Specifically, VALUE10 honors enterprises that serve as value pillars of the national economy based on business performance, innovation, and sustainable development; VBE500 recognizes leading employers through assessments of workforce scale, working environment, and employee satisfaction; VBW10 highlights industry leaders in  workplace quality;  while MAE50 identifies the most attractive employers based on brand appeal, innovation capability,  and long-term investment in people. Achieving high rankings simultaneously across all four lists demonstrates that Coteccons not only creates sustainable value in its business operations but also builds a credible, attractive, and widely recognized working environment for employees, candidates, and stakeholders. These achievements are especially meaningful in a global

Ho Chi Minh City, December 19, 2025 – After more than a year of construction, the “Thuy Van Coastal Road Beautification Project, Vung Tau City” – “the face” of Bai Sau Beach – with a total public investment of over VND 1,068 billion, has been officially inaugurated. This large-scale coastal infrastructure project carries strong symbolic significance in developing public spaces, enhancing quality of life, and promoting sustainable tourism. Amid the national drive to develop modern infrastructure, Coteccons (HOSE: CTD) has left a notable mark by undertaking Package No. 12, valued at VND 485 billion, comprising two key components: the renovation and upgrading of technical infrastructure along 3.2 kilometers of Thuy Van Road, and the construction of Thuy Van Park covering an area of approximately 19.21 hectares. The project’s completion ahead of major holidays such as Christmas, New Year, and Lunar New Year plays an important role in attracting tourists and stimulating the marine-based economy of Ho Chi Minh City. Leaders of Ho Chi Minh City and delegates cut the ribbon at the project inauguration ceremony The Ministry of Construction has announced the commencement and inauguration of 234 key projects nationwide, with a combined investment value exceeding VND 3.4 quadrillion, spanning infrastructure, transportation, urban renewal, and public space development. These projects highlight the strong acceleration of public investment across the country, serving as a critical driver of socio-economic growth. In this context, Coteccons views its participation in infrastructure and public investment projects not only as a business opportunity but also

84.28-35142277
Contact@Coteccons .vn

GENERAL INQUIRIES​